OEE calculator
What does downtime cost you?
A few numbers, ten seconds. Estimates are enough — the goal is to see the order of magnitude.
MachineTakt · OEE estimate
Estimate
Your OEE
84.9%
0.1 pp below world class
- Availability
- 87.5%
- Performance · assumed
- 100.0%
- Quality
- 97.0%
- 4,000 h
- hours lost per year
- Enter the value of an hour to see the loss in denars.
How it is calculated
- Planned time = shifts × hours × days × machines = 32,000 h
- Availability = (shift time − downtime) / shift time = 87.5%
- Performance = as entered, or 100% if empty (MachineTakt measures it exactly) = 100.0%
- Quality = 1 − scrap = 97.0%
- OEE = availability × performance × quality = 84.9%
- Hours lost = downtime × shifts × days × machines = 4,000 h
- Value lost = hours lost × value per hour = —
An indicative estimate, not a guarantee of savings. Downtime is only the availability loss; slow running and micro-stops belong to performance.
Book a demo with your numbers
The estimate travels with your request — in the demo we compare it with what MachineTakt would measure in your plant.
From estimate to measurement
- Downtime is measured by the system, not recalled at the end of the shift.
- Every minute gets a reason — you see which loss is the biggest.
- Performance and micro-stops are measured from the machine pulse.